Al-Qawasmi, J (2016) Vernacular as a renewable resource: toward region-specific architecture in Saudi Arabia, a case from KFUPM. Architectural Engineering and Design Management, 12(02), 81–96.

Barbosa, J A, Araújo, C, Mateus, R and Bragança, L (2016) Smart interior design of buildings and its relationship to land use. Architectural Engineering and Design Management, 12(02), 97–106.

de Melo, R S S, Do, D, Tillmann, P, Ballard, G and Granja, A D (2016) Target value design in the public sector: evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(02), 125–37.

  • Type: Journal Article
  • Keywords: Target value design; target costing; public sector; cost management; design management;
  • ISBN/ISSN: 1745-2007
  • URL: https://doi.org/10.1080/17452007.2015.1106398
  • Abstract:
    Target Value Design (TVD) is a management practice that steers the design and construction of the project to the customer's constraints while maximizing the value delivered within those constraints. TVD practice has been mostly pursued in private projects on which the client and key members of the project team all sign one multiparty contract. The use of TVD in public sector projects may differ widely in terms of application process and achievable results if compared to its use in private projects. This in-depth case study investigates how a public owner applied TVD given public procurement restrictions. Evidence from this case study suggests that TVD can be applied in public sector projects in which multiparty contracts are prohibited. Although it was not possible to apply all of the elements of the current TVD process benchmark on the project due to regulatory or legal restrictions, evidence from this case study suggests that a not full-fledged application still provides significant cost savings and allows design to be steered towards a target cost on a public project.

Emmitt, S (2016) Editorial. Architectural Engineering and Design Management, 12(02), 79–80.

Emmitt, S (2016) The construction design manager – a rapidly evolving innovation. Architectural Engineering and Design Management, 12(02), 138–48.

Wongbumru, T and Dewancker, B (2016) Post-occupancy evaluation of user satisfaction: a case study of “old” and “new” public housing schemes in Bangkok. Architectural Engineering and Design Management, 12(02), 107–24.